Part I
Since I began posting a few things about our guest house, I thought I'd also post a little bit about the house itself. Originally, it started out as a "Mother-in-law" house for my mother to live in. She had cancer and was living alone in Texas and we were hoping to move her to Iowa and come and live with us, but she didn't want to 'impose' on us. So hubby decided to begin building the garage/small house with the intention of moving my mom to Iowa. Our original plan included the two garages we wanted and a 1,000 sq ft one story home. However, my mom passed away even before we began building.
So we ditched the original plan and went with plan #2 which was a two-story house built into the back of the garages. Here is a short re-cap of our building process:
The Planning
In May of 2009, we began building a garage/guest house across from our home at the lake. We wanted to build just a garage that would hold all the odds and ends as well as our 24' pontoon boat. However, the zoning requirements for the lot required us to have an actual home. After much research, we found a "stock" plan online that was exactly what we wanted! It had a two-car garage as well as an "RV" garage and both garages faced the road. The house is located towards the back of the garages and is two stories.
For the most part, it was completed in the late summer of 2010. We are still waiting for the carpeting to be installed upstairs and landscaping will be done this summer.
The guest house inside is complete (well, except for the carpeting) but it is not yet furnished. I'm looking forward to decorating it and posting the process on my blog. More photos to come soon! Here are the guest house posts I have so far:
The First Floor
The Second Floor
First Furniture Item Arrives!
The Floor Plan
This is the stock photo of the outside.
The floorplan for downstairs.
The upstairs floorplan
The Building Process
 |
| Land is being cleared for building process to begin |
 |
| Plotting lines for the house |
 |
| Footings dug and filled in with cement |
 |
| Garage floors are poured |
 |
| First walls to go up! |
 |
| Bay window for kitchen table |
 |
| More first floor framing |
 |
| Tall "RV" garage -- this is where pontoon boat will be parked in the winter |
 |
| 2nd floor framing begins |
 |
| Another view of the 2nd floor framing |
 |
| Roof trusses going up |
 |
| Roof is on! |
I will post Part II : The interior building process later this week!